Kiosk Installation

AQT have recently completed an installation designed to assist one of their clients with a re-organisation of existing site assets to allow the complete shut off and eventual removal of a redundant building.

The new installation consisted of 2 security kiosks, 1 to house the MCC and site telemetry with the smaller kiosk used for signalling.

To enable effective landing of the kiosks all appropriate civil work was undertaken including forming a concrete base, all troughs and ducting and careful removal of spoil from site.

Associated IDS was installed including coverage of the assets with CCTV. End-to-end testing was conducted, and commissioning completed to ensure that the work met the detailed design. As ever, work was completed on time, and in budget.

Project Details

DATE

APRIL ’22

PROJECT TYPE

SECURITY

CONTRACTOR

AQT Global

Project Gallery

Contact us for a quote

Our friendly team are on hand to support your project requirements and to answer any questions you may have.